Here’s the closet in 360 degrees.
…and lastly, the backporch is coming together.
The sewing room is starting to look good…..
It has been a loooong time, I know. Here are some bedroom pics.
The second floor bathroom is coming along. All the tile is in!
Comments….
I have no idea what I’m doing so I can only tell you that I think I added the ability to post comments today. Click on the word “Comments” on the bottom of the post and see what happens. Like I said, “I think” I added it.
Here are some things I plan on incorporating into the new closet.
We have paint on our walls! Excuse the dust on the lens. There is dust on everything I own.
The drywall upstairs is in and taped and sanded………
Very quickly, wall tile went up and fixtures got installed.
In the living room I came home to find a hole in the wall and shortly new windows were in. I had no idea they planned on doing this that day or I would have taken some “before” shots of the glass block windows that were there.
1st floor bathroom - drywall and floor tile in. Next step, primer and grout.
Been awhile since I’ve updated- sorry. Here are some shots of the back porch.
Here are some inspiration photos for the first floor bath which my contractor says might be done in one week!
